Archer reported $5.1 million in revenue and ended the September quarter with $1.354 billion in cash, cash equivalents and short-term investments.
In Los Angeles, some of the spending is preparing an operation Archer wants to test ahead of the 2028 Olympics. The company plans to fly its electric Midnight air taxi out of Hawthorne, close to Los Angeles International Airport. An FAA market-survey airworthiness certificate clears the way for those piloted flights. Compliance testing continues in parallel as Archer works towards type certification.
Hawthorne brings aircraft, charging equipment and ground crews together. Archer refurbished the terminal, installed chargers and began building hangars. The network will also need take-off sites elsewhere.
The agreement signed with Boeing in August brings together three different businesses. Wisk develops an air taxi designed to fly autonomously. SkyGrid works on airspace integration and traffic management. Insitu makes uncrewed aircraft. Insitu would give Archer an established business alongside its civil aircraft development programme.
Boeing is due to take a stake in Archer and retain access to Wisk’s autonomous flight technology for its own programmes under a sharing agreement. The deal changes who owns the subsidiaries while preserving a route for some of their technology into Boeing’s own aircraft.
Joby is pursuing certification for electric air taxis too, with flights under the federal pilot programme in Texas and Florida. Its Blade business already contributes revenue, mainly from existing transport services. Archer is looking to Boeing for an operating business in uncrewed aircraft while it prepares Midnight for service.
Documents and references
- Archer AviationRésultats du T3 déposés à la SEC
- Archer AviationLettre trimestrielle aux actionnaires
- Boeing et Archer AviationAnnonce conjointe de l’accord
- Archer AviationRapport trimestriel de juin
- Joby AviationRésultats du T3
