Ukraine’s Defence Ministry says DOT signed UAH 333.6 billion in first-half 2026 drone contracts, twice the year-earlier value. FPV drones form the largest category by units contracted. The sum covers signed deals, not deliveries to units.

Model selection is changing with frontline requirements. Since March the ministry has described a process in which commanders use unit requests and combat data to define technical specifications. Systems such as ePoints, DELTA and Mission Control inform assessments of drones already used. DOT can then contract the selected systems. The process channels orders towards equipment proven in use while reserving part of the budget to test new designs.

DOT-Chain Defence was designed to let units select drones suited to their own sector. The ministry launched it in 2025 as a procurement-platform module alongside central orders. Manufacturers can see demand more clearly and plan production, while the agency structures contractual relationships. The route is intended to deliver specific models faster, rather than relying solely on stocks chosen away from the front.

Earlier data show how purchasing and delivery move on different timelines. In early August 2025 the ministry reported more than one million FPV drones supplied between January and July, against over two million contracted for the full year. Procurement also uses framework agreements based on required performance rather than a named brand, allowing manufacturers to compete. The new financial figure measures the scale of contracts signed in 2026; supply figures track equipment that has reached units.

In March the ministry also launched a minimum monthly drone-supply scheme for frontline brigades. It covers FPV, reconnaissance and bomber aircraft alongside other procurement channels. The intended regularity responds to rapid equipment attrition and varied missions: surveillance, strike and logistics support. For manufacturers, the scale of contracts gives a clearer demand signal; for units, the practical result depends on delivery pace and whether the supplied models fit their tasks.

Documents and references