TAROM welcomed its first 737-8 on 12 September, naming it Mircea Lucescu. CDB Aviation is supplying two on lease. The wider plan covers four aircraft obtained through finance or operating leases; the other two come from elsewhere.
The arrival ends a wait longer than the delivery alone suggests. In 2018, TAROM and Boeing announced an order for five 737 MAX 8 jets. The airline saw them as a way to modernise its fleet, serve existing routes better and open new markets. Eight years separate that original announcement from the first MAX entering its fleet.
Leasing lets the airline introduce a newer aircraft without paying its full purchase price on delivery. For a carrier whose recovery plan depends on better-matched costs and capacity, it spreads commitments over time. CDB says the first jet is one of two it is supplying and that the second was expected in the autumn.
The European Commission approved restructuring aid for TAROM in 2025. Its assessment describes a plan combining fleet renewal, route optimisation and efficiency measures; four 737-8s were to replace outgoing aircraft, using one finance lease and three operating leases. The decision sets the framework for state aid; expected savings will also depend on how the aircraft and route network are used.
The new aircraft must fit a streamlined airline: TAROM retired its last A318s in 2024 and until now used older 737s as its only jets. The company says the first MAX will serve major European capitals. The advertised fuel savings against the aircraft being replaced will matter alongside matching capacity, schedules and demand on retained routes.
Documents and references
- TAROMTAROM 737-8 delivery
- Air Data NewsTAROM fleet history
- CDB AviationCDB lease delivery
- European CommissionEU restructuring decision
- Boeing via PR Newswire2018 Boeing MAX order
